All Steps
Close
Step 39 of 43

Assembly – Plunger and Primer Rod Installation

Push the (Item 26) plunger & (Item 30) primer rod assembly all the way through the (Item 15) pressure chamber body until the (Item 30) primer rod flats are accessible at the bottom of the (Item 15) pressure chamber body.