Assembly – Tie Rod Installation
Reorient pump components based on markings from step 5.
Thread three (Item 11) nuts onto three (Item 10) tie rods. With (Item 11) nuts facing the (Item 15) pressure chamber body, thread the three (Item 10) tie rods, five threads deep, into the designated ports.