Assembly – Solvent Cup / Packing Nut
Apply PTFE tape to the threads on the (Item 2) packing nut.
Note: Threads must be clean and treated with Loctite 7471 Primer T, which requires 3-5 minutes to dry.
Starting with the bottom end of the (Item 2) packing nut with packings already installed, slide it over the button end of the (Item 26) plunger and thread into the (Item 6) outlet body.
Note: Apply additional compatible lubricant to the packing if needed to assist in this assembly.