Assembly – Foot Valve Body (continued)
Slide (Item 20) pin into factory opening on (Item 19) ball guide.
Slide (Item 19) ball guide and new (Item 7) gasket (hidden) from the repair kit over (Item 21) ball inside the (Item 15) foot valve body.
NOTE: The pin is positioned in center holes at the factory. If more ball lift is desired for heavier (more viscous) material, change pin to upper holes. For less lift (light materials), change pin to lower holes.